Pre-assessment guide

Air Conditioner Selection Guide

Use area, exposure and usage as an initial reference; confirm the final capacity with a specialist survey.

01

Room details

Enter the main heat-load variables for a preliminary assessment.

Exposure and sunlight
Insulation
Use
02

Consider the system type

Installation conditions and usage determine the suitable equipment type.

Wall-mountedConfirmed by survey
Floor-standingConfirmed by survey
Cassette / ductedConfirmed by survey
Multi split / VRFConfirmed by survey
03

Pre-installation checks

Outdoor-unit position, drainage, power and pipe route must be reviewed on site.